Eight engines at the BWSC Delimara plant have clocked up almost two months of inactivity this year because of faults, Times of Malta has learnt.
In 10 months a number of generating units had to be shut down for a total of at least 1,419 hours, equivalent to nearly 60 days.
The plant, commissioned in 2012, has been dogged by a series of problems, which the Energy Ministry has blamed on the complexity of the engines and the abatement system that cleans exhaust before it is released into the air.
Read the full story in Times of Malta, on the e-paper, or on timesofmalta.com premium here.