Resurfacing works in Għajn Tuffieħa Road, Mġarr, will continue today and the road will be closed until 4pm.
Vehicles from Mġarr will be diverted on to Ta’ Mrejnu to Għajn Tuffieħa. Traffic from Għajn Tuffieħa Road will be diverted onto San Martin Road to Żebbiegħ.
Part of Saqqajja Hill, Rabat, will be resurfaced following work on the sewage system.
Works will be done from Monday to Saturday. Only the carriageway towards Rabat will be open to traffic, from 9am to 6pm. Southbound vehicles will use L-Infetti Street. The road will be closed from 7pm to 5.30am.
Vehicles will be diverted to the roundabout between Mosta and Ta’ Qali. The road will be accessible in both directions from 5.30am to 9am.
Transport Malta also said that from Monday until further notice, the Dock 7 shortcut will be open for traffic from Monday to Friday from 6am to 10am and 3pm to 7pm.