The cost of inaugurating the Breakwater Bridge amounted to just under €30,000, Infrastructure Minister Austin Gatt revealed in Parliament on Wednesday.
He was answering a question by Gino Cauchi (PL).
Dr Gatt gave the House a breakdown of the costs totalling €29,676.20. The major cost, €27,078, was for the setting up of the site for the inauguration.